CREG.
China Railway Engineering Equipment Group Co., Ltd
CREG provides full-range TBM solutions for mechanized tunnelling constructions: EPB, Slurry, Single-shield, Telescope shield, and Gripper TBM, with boring diameter ranging from 3 m to 15 m. This speaks of CREG’s unremitting commitment to technical standard and service quality at the highest level, as well as a sound assurance of customer-oriented operative efficiency.